ZONE BY ZONEOpen the free worksheet →
Free homeowner resource

Mini-split quote checklist

Compare the written room plan, equipment, routes, and installation scope before comparing totals. Bring these questions to each installer; use their answers to understand what each proposal actually includes.

Use this to ask—not to size or choose a system. A worksheet or checklist cannot determine the right equipment, verify an installation, judge a contractor, or tell you whether a price is fair. Ask a qualified professional to assess your home and explain the design.

For each proposal, look for clear written answers to the same questions. If something is missing, mark it “not stated” and ask. “Listed” does not mean “correct”; the installer should verify the final design and equipment.

ROOMS

1. Match the rooms to the proposed air delivery

Start with a room-by-room map. A different head count or zone layout can change what each bid covers.

Ask: “Can you show which indoor unit or air path is intended to serve each room, and note anything outside the scope?”
SIZE

2. Ask how the system was selected

Do not choose equipment from square footage or the worksheet. Ask the installer to explain the sizing basis and the assumptions for your home.

Ask: “Can you walk me through the room loads, exact model pairing, and performance data at my local design conditions?”
ROUTE

3. Compare placement, piping, and drainage

The route and locations affect the visible finish, access, and how the installation fits your home.

Ask: “Could you mark each line route and unit location on the plan, including what gets covered, patched, or left visible?”
SCOPE

4. Put responsibilities and included work in writing

When a detail is unclear, ask who is responsible and whether the cost is included in the proposal.

Ask: “Please list each included item, allowance, exclusion, and owner responsibility in the written scope.”
TOTAL

5. Compare totals only after aligning scope

A side-by-side total is just arithmetic if the bids cover different rooms, equipment, electrical work, or finish repairs. It is not a market benchmark or a judgment about value.

Ask: “Could you separate the base scope from optional items and identify assumptions that could change the total?”

Independent references

These references do not endorse this worksheet or any installer. Local codes, project details, and equipment requirements vary; confirm them with a qualified professional.